Sign In | Join Free | My isp.org.cn |
|
Pullner QC
Pullner has a complete ISO quality management system to ensure product quality and traceability. Strict quality inspection and control process, including incoming inspection of raw materials, inspection during production, and ex-factory inspection of finished products, serves as the quality assurance for each product before leaving the factory.
Manpower List for Quality Control Department
S/N |
Name |
Title |
Work Experience |
1 |
Qin Shaofei |
QC Manager, Quality Inspector for filter element and Semi-finished products. |
4years |
2 |
Liu Lilan |
Quality Inspector for filter element |
10years |
3 |
Zhou Wanxiang |
Quality Inspector for Semi-finished products |
1year |
4 |
Ma Wenbo |
Material Certificate Inspector |
1year |
Personnel Responsibility for Quality Department
1. QC manager: Qin Shaofei
He is responsible for all fabrication quality control activities around the company. He shall communicate with other department and quality department.
He is responsible for defining and specify product quality inspection basis and approval standard with the help of technology department.
He shall arrange daily inspection works to all staffs from quality department.
If any quality non-conformance, or quality deviation is found, he has the right to issue NCR to other department, such as procurement depart. Technology depart.
2. Inspector for products: Liu Lilan
Inspectors are arranged in different area. They are responsible for product quality inspection and follow each step. They shall guarantee only qualified product can be marked with “approved” and allowed for delivery. If any defects are found during fabrication, the fabrication shall stop immediately. Inspector shall submit “Un-qualified notes”to related person/depart. If the defect is acceptable, the engineer shall signature his name on the NCR notes and propose his suggestion, such as: scrapping, reuse, or acceptable for normal use.
3. Material Certificate Inspector: Ma Wenbo
He is responsible for material certificate checking and approval. If the material certificate does not meet the requirement listed on datasheet. He shall send feedback to procurement.
Training Records for QC department
Punller has developed an annual training plan for the quality inspection department, including induction training for new employees, regular technical training for all quality inspectors, technical training together with technical department for new products, and temporary training for quality problems.
Certifications
ISO 9001 ISO 14001 ISO 45001
High-tech Enterprise Certificate
Pullner Patents
|
|
|
|
|
|
|
Contact Person: MissLucy